Delhi metro, phase III, Contract CCDD-06

The third phase of Delhi Metro Line involves the construction of 136km metro line with 90 stations.

This new link will benefit the entire metropolitan rail network by creating more rail capacity in the inner-city. Also, the transport routes in project would that meet the social and economic needs of the growing communities.

Under the CCDD-06 Contract, SYSTRA India provides Detailed Design Consultancy for the Civil, Architectural and E&M works for : Mundka -Bahadurgarh and Dwarka Najafgarh elevated Line of Phase-III of Delhi Metro Project. It includes:

  • Alignment review
  • Architectural Conceptual Design and Design alternatives for all stations
  • Architectural Tenders (including drawings, BOQ and specs)
  • Architectural Detailed Design for all stations including, finished & multimodal integration plans at interchange stations with others modes/property development
  • E&M Preliminary & Final Design
  • E&M Tenders (including drawings, BOQ and specs)
  • E&M Detailed Design for all stations (E&M activities include Electricity, HVAC, Plumbing, Fire Detection & Fire Fighting, Lighting studies)
  • Proof checking of structural design of civil contractors for stations, viaducts (substructures only), and underground structure excluding tunnel but including cross passages, ventilation shafts and other shafts, ramps and other understructures including temporary structures, and including construction methodologies
  • Full depot detailed design (structural, architecture and MEP)

ESSENTIAL

Mundka - Bahadurgarh corridor :

  • Lentgh :11.2km
  • Stations : 7 Elevated

Dwarka-Najafgarh corridor

  • Lentgh :4.3km
  • Stations : 2 Elevated & 1 Underground
  • Rail Gauge = 1,436 mm (4ft 8.5 in) standard gauge
  • Overhead Catenary Traction System = 25 kV, 50 Hz AC.
  • Status : On-going

CLIENT

Delhi Metro Rail Corporation Ltd.

Go Back

Read Also

Chhatrapati Shivaji International Airport, Mumbai Modernization

The new iconic Terminal 2 is state-of-the-art 4 level integrated terminal with an area(...)

Moolchand Bridge

The Moolchand bridge is located on the Delhi metro line 3 extension. It crosses a highway and a road(...)

Ahmedabad metro Phase 1

The main purpose of this project is to Connect the eastern and western parts of Ahmedabad city and i(...)

Chennai Metro Phase 1 Extension : underground section

Chennai Metro Rail Limited (CMRL) has planned to extend the Corridor-1 from Washermanpet(...)

SYSTRA MVA Consulting (India) Private Limited, Vatika Mindscapes, Mathura Road, Faridabad T.(+91) 129 668 5600

Contact