The project includes a feasibility study of 640km of high speed rail corridor, with trains running at 320kmph in average.The broad objective of the project was to provide an efficient and time saving transport solution for passengers commuting between Pune-Mumbai-Ahmedabad.

SYSTRA GROUP as a leader of the consortium, was appointed to conduct the feasibility study for Pune-mumbai-Ahmedabad and was actively supported by SYSTRA INDIA for the following tasks :

  • The traffic movement during construction phase & protection of close buildings around
  • Project management
  • Global review of HS projects
  • Supervision of traffic surveys for all modes of transport (origin-destination, counts and opinion)
  • Creation of a multi-modal traffic forecast model
  • Overall design specifications
  • Civil engineering, earth moving works, structures and tunnel
  • Track, signalling, energy and catenary, telecommunication, central control office
  • Infrastructure maintenance
  • Layout and station siting
  • Estimation of investment and operating costs
  • Supervision of socioeconomic and financial reviews

ESSENTIAL

  • High Speed rail
  • Feasibility study of Pune-Mumbai-Ahmedabad corridor
  • July 2015 : Studies was completed

Pune-Mumbai-Ahmedabad corridor

  • 640 km of lines
  • 5 stations
  • 11 tunnels ( including one undersea tunnel near Bombay)
  • 2 viaducts
  • 17 km long Trans-Harbour link
  • Design Speed & Commercial: 350 km/hr.
  • Operational Speed taken for Design of High Speed Corridor = 300 km/hr.
  • Status : on-going

CLIENT

Ministry of Railways, India

Go Back

Read Also

Lucknow Metro : Underground Section

The first phase of development of the Lucknow Metro Rail Project comprises two corridors(...)

Mumbai Monorail Project

L&T Scomi Consortium has appointed Systra MVA to carry out a pre-construction traffic study(...)

HSR : Mumbai-Chennai corridor

Minister of Railways in the Railway Budget 2014-15 has pronounced setting up of Diamond Quadrilatera(...)

Delhi metro Phase III, Contract CC-15

The Delhi Metro Phase - III involves the construction of 136km metro line with 90 stations.(...)

SYSTRA MVA Consulting (India) Private Limited, Vatika Mindscapes, Mathura Road, Faridabad T.(+91) 129 668 5600

Contact