Mumbai Metro Line 1

Mumbai metro line 1 is an elevated corridor of 11.5km with 12 stations (from Versova, via Andheri to Ghatkopar). It provides connectivity from Eastern & Western Suburbs to Western & Central Railway, and facilitate smooth and efficient interchange between suburban rail system and MRT System at Andheri and Ghatkopar stations.

SYSTRA India was appointed to provide Engineering and Project Management services including detailed designing for Mumbai Metro line 1. It includes:

  • Preparatory activities Review of existing scenario
  • Preliminary design and tender documents
  • Preparation of Master plan and preliminary integrated system Design,
  • Preliminary (Tender) design and drawings for each sub-system.
  • Bid process Management and Review/ proof checking
  • Assistance in tender process,
  • Detail design & Engineering,
  • Review, Proof checking and Vetting.
  • System Integration

ESSENTIAL

  • Metro
  • Route : From Versova via Andheri to Ghatkopar

Mumbai Metro Line 1

  • Length : 11.5km
  • 12 stations
  • 1 depot
  • Stations : 12 (including 2 interchanges)
  • Versova-Ghatkopar's journey : 21 minutes
  • Ridership : 60,000 passengers per hour
  • Trains : 12
  • Status : Completed

CLIENT

Mumbai Metro One private Limited

Go Back

Read Also

Ahmedabad metro Phase 1

The main purpose of this project is to Connect the eastern and western parts of Ahmedabad city and i(...)

Kolkata metro

The line which would connect Howrah and Sealdah Railway(...)

Delhi Metro Line 7, Phase III : Underground Section

SYSTRA India has been engaged as Detail Design Consultant (DDC) for Civil, Architectural and Buildin(...)

Bangalore metro, phase II

Bangalore metro project phase II involves the construction of 72 km of metro lines with 69 stations,(...)

SYSTRA MVA Consulting (India) Private Limited, Vatika Mindscapes, Mathura Road, Faridabad T.(+91) 129 668 5600

Contact