Navi Mumbai Metro

Navi Mumbai metro Rail project includes a construction of an elevated line of 117.3km. The aims is to create comfortable and better quality services for the commuter through modern technology and reduce the travel time.

The project will be integrated with the Mumbai Metro. A total of six corridors in the city have been identified to construct the project.

SYSTRA India was appointed to provide Detailed Design for complete implementation of the electrical system, for Belapur-Pendhar section, a part of the Corridor II, phase I. It includes :

  • Power supply
  • Traction & SCADA system
  • Simulation study report of : Power supply
  • Traction & SCADA System

ESSENTIAL

Electrification project

Navi Mumbai Metro

  • Corridor 1 : 28.3km of line with 10 stations, from Uran to Rajapandra to Nerul
  • Corridor 2 : 21 km of line from Belapur to Khandeshwar
  • Corridor 3 : 33.5 km of line from Colaba Bandra to Seepz with 27 stations (1 ground level station, 26 underground)
  • Corridor 4 : 14km of line from Ranjanpada to Kharkopar to Seawoods
  • Corridor 5 : 20 km of line from Dighe to Turbhe to Belapur.
  • Corridor 6 : 9km of line from Vashi to Ghansoli to Mahape

Belapur-Pendhar section

  • Length : 11km
  • Status : Completed

CLIENT

Mumbai Metro One private Limited

Go Back

Read Also

Pragati Maidan Bridge

Indraprastha-Bara-­khamba Road-Dwarka(from Delhi metro line 3), 32.1 km long, is mainly(...)

Chhatrapati Shivaji International Airport, Mumbai Modernization

The new iconic Terminal 2 is state-of-the-art 4 level integrated terminal with an area(...)

Lucknow Metro, Phase 1A - North-South Corridor

Lucknow metro involves s a construction of 35km of line with 34 stations divided in two corridors: N(...)

Mumbai Metro Line 1

Mumbai metro line 1 is an elevated corridor of 11.5km with 12 stations (from Versova, via Andheri to(...)

SYSTRA MVA Consulting (India) Private Limited, Vatika Mindscapes, Mathura Road, Faridabad T.(+91) 129 668 5600

Contact