Navi Mumbai Metro

Navi Mumbai metro Rail project includes a construction of an elevated line of 117.3km. The aims is to create comfortable and better quality services for the commuter through modern technology and reduce the travel time.

The project will be integrated with the Mumbai Metro. A total of six corridors in the city have been identified to construct the project.

SYSTRA India was appointed to provide Detailed Design for complete implementation of the electrical system, for Belapur-Pendhar section, a part of the Corridor II, phase I. It includes :

  • Power supply
  • Traction & SCADA system
  • Simulation study report of : Power supply
  • Traction & SCADA System

ESSENTIAL

Electrification project

Navi Mumbai Metro

  • Corridor 1 : 28.3km of line with 10 stations, from Uran to Rajapandra to Nerul
  • Corridor 2 : 21 km of line from Belapur to Khandeshwar
  • Corridor 3 : 33.5 km of line from Colaba Bandra to Seepz with 27 stations (1 ground level station, 26 underground)
  • Corridor 4 : 14km of line from Ranjanpada to Kharkopar to Seawoods
  • Corridor 5 : 20 km of line from Dighe to Turbhe to Belapur.
  • Corridor 6 : 9km of line from Vashi to Ghansoli to Mahape

Belapur-Pendhar section

  • Length : 11km
  • Status : Completed

CLIENT

Mumbai Metro One private Limited

Go Back

Read Also

BRTS Mumbai - Pune road

The project covers conceptual planning of access to all corridors in the first phase network(...)

Delhi metro, phase III, Contract CCDD-06

The third phase of Delhi Metro Line involves the construction of 136km metro line with 90 stations.(...)

Ahmedabad metro Phase 1

The main purpose of this project is to Connect the eastern and western parts of Ahmedabad city and i(...)

Moolchand Bridge

The Moolchand bridge is located on the Delhi metro line 3 extension. It crosses a highway and a road(...)

SYSTRA MVA Consulting (India) Private Limited, Vatika Mindscapes, Mathura Road, Faridabad T.(+91) 129 668 5600

Contact