Subiyah Bridge

Subiyah Bridge, as known as the “Sheikh Jaber Al-Ahmad Al-Sabah Causeway”, Its main signature cable-stayed bridge with its exquisite arch pylon will rise as a land mark in the middle of the vital navigation route of the Kuwait Bay.

The main objectives of the project to :

  • Reduce journey time from 90 minutes to less than 30 minutes.
  • Provide new strategic highway routes to facilitate planned development to the north of Kuwait City.
  • Reduce traffic congestion in the surrounding roads.

As a design consultant, SYSTRA India provided these following services:

  • Offshore bridge design
  • Building design(Architecture, MEP & Structure)
  • Geotechnical design for the offshore bridge
  • Utilities infrastructure design (Hydraulic Modelling)
  • Road and Embankment Design

ESSENTIAL

  • Bridge
  • Unique architecture : cable stayed with its arch pylon

Subiyah Bridge

  • 36 km long
  • 3 traffic lanes on each carriage way
  • 10,000 drawings to produce
  • 5 years construction
  • More than 100 employees from SYSTRA India have worked on the design.
  • Status : on going-construction

CLIENT

Hyundai - CGCC JV

Go Back

Read Also

Delhi Metro Line 7, Phase III : Underground Section

SYSTRA India has been engaged as Detail Design Consultant (DDC) for Civil, Architectural and Buildin(...)

Hyderabad Metro

Hyderabad Metro metro involves a construction of 71.12km of line with 66 stations divided in three (...)

Chennai Metro Phase 1 Extension : underground section

Chennai Metro Rail Limited (CMRL) has planned to extend the Corridor-1 from Washermanpet(...)

Delhi metro Phase III, Contract CC-15

The Delhi Metro Phase - III involves the construction of 136km metro line with 90 stations.(...)

SYSTRA MVA Consulting (India) Private Limited, Vatika Mindscapes, Mathura Road, Faridabad T.(+91) 129 668 5600

Contact